How Long Does It Take to Rewire a House?

Planning a complete electrical upgrade can raise an important question: How long does it take to rewire a house? Whether you own a small flat, a terraced property or a larger family home, the time required depends on the property’s size, existing wiring, accessibility and the amount of electrical work involved. In most cases, a full house rewire takes approximately 5–10 working days, although smaller properties may take less time and larger or more complex homes can require longer.

For homeowners in London, understanding the rewiring process can make it easier to plan around temporary power interruptions, furniture arrangements and any additional building work. This guide explains typical rewiring timescales, what happens during the installation and which factors can affect the overall schedule.

How Long Does a Full House Rewire Usually Take?

A full house rewire typically takes around 5–10 working days for an average-sized property. However, this is a general estimate rather than a guaranteed completion time. The electrician must assess the existing installation and the property’s requirements before providing a realistic schedule.

Here is an approximate guide to common property sizes:

Property typeEstimated rewiring time
1-bedroom flat2–4 working days
2-bedroom house4–7 working days
3-bedroom house5–10 working days
4-bedroom house8–15 working days
Larger properties10–15+ working days

These estimates refer to the electrical installation work and can vary depending on access, layout, the number of circuits and the complexity of the project. Plastering, decorating and other finishing work may require additional time.

7 Factors That Affect How Long House Rewiring Takes

Not every property follows the same installation schedule. Several factors can influence how quickly electricians can complete a full rewire.

1. Size and Layout of the Property

Property size is one of the biggest factors affecting rewiring time. A small flat generally has fewer rooms, shorter cable routes and fewer electrical circuits than a large detached house.

Larger properties may require additional time because electricians need to install more cables, sockets, switches and lighting points. Multiple floors, extensions and complicated layouts can also make cable installation more challenging.

2. Whether the Property Is Occupied

Rewiring an empty property is often quicker because electricians have easier access to floors, walls, ceilings and electrical points.

An occupied home can require additional planning. Furniture may need to be moved, rooms may need to be completed in stages, and household activities must be considered when scheduling work.

If possible, clearing rooms before the installation begins can help reduce unnecessary delays.

3. Condition of the Existing Electrical Wiring

The condition of the existing installation can influence the amount of preparation required.

Older wiring, damaged cables, previous electrical alterations and unsuitable connections may need additional investigation before replacement work can proceed.

If electricians discover unexpected problems during the project, the original schedule may need to be adjusted to ensure the installation is completed safely.

4. Number of Sockets, Switches and Lighting Points

The number and location of electrical accessories can affect the installation timeline.

For example, adding extra sockets, relocating light switches or introducing additional lighting circuits requires more planning and installation work.

Discussing your preferred electrical layout before the project starts can help the electrician prepare an accurate work schedule.

5. Accessibility of Cables and Wiring Routes

Electricians need suitable access to install new cables throughout the property. Floor construction, wall materials, ceiling access and existing building features can all affect the work.

Properties with accessible loft spaces and floor voids may allow easier cable routing. Solid walls, concrete floors and restricted spaces can require more time and coordination.

6. Additional Electrical Work

Some homeowners choose to combine a full rewire with other electrical improvements.

These may include:

  • Installing additional power sockets.
  • Upgrading lighting arrangements.
  • Replacing an outdated consumer unit.
  • Adding dedicated circuits for larger appliances.
  • Preparing electrical supplies for future equipment.

Additional work should be discussed before installation begins because changes to the agreed specification can extend the project.

7. Inspection, Testing and Certification

A rewire is not complete simply because new cables and accessories have been installed. The electrical installation must also undergo appropriate inspection and testing.

This stage helps confirm that the completed work meets the applicable safety requirements and that protective devices and circuits operate correctly.

The electrician should provide the appropriate electrical certification for the work completed. Allowing sufficient time for testing and documentation is an important part of the overall schedule.

What Happens During a Full House Rewire?

Understanding the main stages of rewiring can help homeowners know what to expect and prepare their properties before work begins.

Stage 1: Initial Assessment and Planning

The electrician assesses the existing electrical installation, discusses your requirements and plans the new electrical layout.

This may include deciding where sockets, switches, lighting points and other electrical accessories should be positioned.

Stage 2: Removing Existing Electrical Accessories

Where necessary, existing sockets, switches, light fittings and other electrical components are removed.

The electrical supply is isolated as required to ensure the work can be carried out safely.

Stage 3: Installing New Electrical Cables

New cables are routed through suitable spaces in walls, floors and ceilings. Electricians install the wiring needed for the property’s lighting and power circuits.

This is often one of the most time-consuming stages, particularly in larger homes or properties with restricted access.

Stage 4: Installing Sockets, Switches and the Consumer Unit

Once the necessary cabling is in place, the electrician installs the agreed electrical accessories and connects the relevant circuits to the consumer unit.

The protective arrangements must be suitable for the electrical installation and comply with applicable requirements.

Stage 5: Inspection and Electrical Testing

The completed installation undergoes inspection and testing. This includes checking relevant electrical circuits, connections, protective devices and other safety arrangements.

Any issues identified during testing must be addressed before the installation is considered complete.

Stage 6: Certification and Completion

After the required inspection and testing, the electrician provides the appropriate certification for the completed work.

Any agreed finishing work, such as plaster repairs and decorating, can then be arranged.

Can You Stay in Your House During Rewiring?

Yes, it may be possible to remain in your home during a rewire, but it depends on the property, the installation plan and the level of disruption involved.

You should expect some inconvenience, including:

  • Temporary interruptions to the electricity supply.
  • Noise from drilling and other installation work.
  • Dust from accessing walls, floors and ceilings.
  • Restricted access to certain rooms.
  • Temporary disruption to kitchen appliances and other electrical equipment.

Some electricians can complete the work in stages to help maintain access to parts of the property. However, this arrangement must be planned carefully.

For larger projects, temporarily staying elsewhere may be more convenient, particularly when extensive work is required throughout the home.

How Can You Prepare Your Home Before a Rewire?

Good preparation can help electricians work efficiently and reduce avoidable delays.

Consider taking these steps before the installation begins:

  1. Clear working areas: Move furniture and personal belongings away from sockets, switches and other electrical points.
  2. Protect valuable items: Cover furniture and remove delicate objects from areas where installation work will take place.
  3. Plan your electrical requirements: Decide where you want additional sockets, switches and lighting before work begins.
  4. Discuss power interruptions: Ask the electrician when electricity will need to be switched off and how long interruptions may last.
  5. Arrange access: Make sure electricians can safely access all rooms, loft spaces and other relevant areas.
  6. Coordinate other trades: If plastering or decorating is required, discuss the sequence of work before the project starts.

These preparations can make the installation process more organised and help everyone understand the expected schedule.

Does a Full House Rewire Include Plastering and Decorating?

Not always. Electrical rewiring and finishing work are often treated as separate parts of a renovation project.

Installing new cables may involve lifting floorboards or creating access points in walls and ceilings. Once the electrical work is complete, some areas may need plaster repairs, filling, sanding and repainting.

Before accepting a quotation, ask whether making good, plastering, waste removal and decorating are included or arranged separately.

Understanding what is covered helps you plan the complete project rather than focusing only on the time required for electrical installation.

Why Choose Professional Electrical Rewiring in London?

A full house rewire is an important electrical project that requires suitable knowledge, planning and testing. The work should be completed by a competent electrician who understands the requirements of domestic electrical installations.

For London homeowners, the condition and construction of the property can influence the installation process. Older houses, converted flats and renovated properties may have different wiring arrangements and access challenges.

Professional electrical work helps ensure that the new installation is properly planned, installed and tested.

You can explore the electrical services offered by BSAG Electrical to learn more about the available electrical solutions. You can also view examples of completed work in the BSAG Electrical project gallery.

Visit the BSAG Electrical homepage for more information about the business and its electrical services.

Plan Your House Rewiring Project with Confidence

A full house rewire usually takes around 5–10 working days for an average-sized UK property, but the actual schedule depends on the home’s size, wiring condition, accessibility and installation requirements.

Planning the electrical layout, preparing rooms and discussing the work with a qualified electrician can help make the process more organised and reduce unexpected delays.

If you are considering rewiring your property in London, explore the BSAG Electrical services page to learn more about the available electrical work and arrange an assessment.

Frequently Asked Questions

A complete rewire of an average-sized house is unlikely to be completed in one day. Smaller electrical jobs or partial rewiring may take less time, but a full installation involves cable replacement, connections, inspection and testing.

Generally, yes. An empty property provides easier access to floors, walls and electrical points. Electricians can work more freely without having to move furniture or coordinate around daily household activities.

Yes, the electrical supply must be safely isolated during relevant stages of the work. The timing and duration of interruptions depend on the installation plan. Your electrician should explain when power will be unavailable.

Plastering time depends on how much wall and ceiling repair is required. Small repairs may take a few days, while extensive plastering and decorating can extend the overall renovation schedule. This work is generally separate from the electrical installation.